Once in Ulster, he toured the houses of O'Hegney (Ó hEighnigh) of Fir Manach and O'Neill in search of help before making his way to de Courcy. Once he had regained his strength, Ua Conchobair returned to Connacht, only to be exiled yet again. In 1200 he repeated his defeats of the Ulster colonists, but his prolonged interest in the affairs of Connacht also began in this year, when Cathal Mór Crobderg Ua Conchobair (qv) (O'Connor) of Connacht fled to Tír Eógain. He first came to the notice of the annalists by defeating five expeditions by John de Courcy (qv) into his country and by deposing the king of Tír Conaill (1199). 1230), king of Tír Eógain, was son of Áed O'Neill, disputed king (1166–77) of Tír Eógain, and was a powerful and influential ruler from the late twelfth century to his death. Round pipe diameter:Φ40-130mm,thickness:1.2-5.0mm,Q235 OR below grade.ĭriving motor :22KW (15 SERVO ( YASKAVA )įeeding motor :5.5KW 4.4 SERVO ( YASKAVA )īlade cutting motor :2 2 KW 18.(d. Used to precisely cut the pipe to length automatically under the condition that the pipe continuously delivered from the mill at high speed. The tube seam is welded under theįorming speed:75X45-80m/min;100X100-60m/min Due to the skin and the kindred effect, the high-frequency current is concentrated on the weld joint that is heated rapidly and reaches the welding temperature. The strip is fed into the forming machine by the feeding device in the mill and the forming roller continuously rotate and press the strip into the required shape. The electric motor of the accumulator frame : 55KWįorming & Sizing Mill adopts roller type forming principle and high-frequency induction welding. It can carry the strip steel to shape system and send the carry out material velocity information to electric control device.Īdvantage:storage more material,no strike to strip steel surfaceĬarry material going velocity:Vmax=120m/minĭirectly electric motor power of the press & carry:30KW Send-off material device: include frame, guide direction rolls, guide out roll of high or lower place. It can be used to storage the strip steel material from press& carry unit and it could be draw from the center send-off material roll. It is main include frame, electric motor, brake unit, circling direction transfer power axle of the reduce velocity, press & carry roll, pressure air system of guide roll, inspected velocity unit it can supply the strip steel to accumulator and the mean times it will transfer the carry velocity information to electric control system, when we demand stop carry the material to this unit, it will stop roll to the electric motor and press& carry material roll by the break, and also could adjust the velocity to carry electric motor and the unit carry material velocity.Īccumulator frame assemble: include the electric motor, frame, inner circle roll, out circle roll and pressure roll. This unit is main include in press& carry material device, accumulator assemble, carry off material unit, electric control unit. Shear and welder is used to cut the irregular ends of the strips and then connect the strips by welding. The leveling unit with 2 roll pinch and 5 roll leveling. This unit is main used to lead the new coil steel head feed into the flattener unit ter uncoiler unit bring the coil into the working place.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |